21MP male adapter sanitary fitting.

21MP MALE ADAPTER


Web browse the price for a 1'' triclamp 316L male 1'' npt adapter. See $110.00 USD  per part?
($100 per part
and $10.00 raw material.) (12 minutes process time per part.)  ($100 / 12 minutes = $8.33 per minute.)  ($8.33 x 60 minutes =  $500  per hour shop rate.)
ARE YOU MAKING YOUR SUPPLIERS RICH?
Our 316L baseline is below $16.53 process time and raw material.  See below.
BROWSE THE FOLLOWING FOR FURTHER DETAIL: [22MP] [L14AM] [14MPHR] [FERRULES] [TriClamp]

Manufacturing Alliance Associates, Inc.
720 Maple Street, East Aurora, New York 14052-1012   716-652-4510                      [21MP Thread Milling] [Thread Mills] [TriClamps] [Home]

21MP-1.0-1.0-316-7 MALE ADAPTER PROCESS ANALYSIS
[21MP OP1 Video] [21MP OP2 Video]
Please note: videos may take 60 seconds or more to load.





RAW MATERIAL:
316L STAINLESS STEEL BAR 2.00 DIAMETER BAR
ASTM-A276, ASTM-A479, AMS 5648, AMS 5653, AMS-AQ-S-763, ASTM-A182
12 FEET LONG BAR WEIGHT 130 POUNDS
PURCHASE PRICE $468
$3.60 PER POUND
RAW MATERIAL COST PER PART $9.86

2" DIAMETER SLUG
2.312'' OAL
0.04'' ROUGH STOCK
0.122'' CUT OFF WIDTH
2.474'' IN PROCESS SLUG
2.74 #s
NET SHAPE
2.312'' OAL



0.75 #s
DELTA




1.99 #s
RECYCLED MATERIAL




72.6%

RECYCLED MATERIAL:
$1.20 PER POUND
RECYCLED MATERIAL PER PART $2.33

MACHINE TOOLS:

LATHE OPERATIONS SINGLE SPINDLE TURNING CENTER TOTAL CYCLE TIME XXX SECONDS (X.XXX MINUTES)

MILL OPERATION SINGLE SPINDLE TURNING CENTER TOTAL CYCLE TIME XXX SECONDS (X.XXX MINUTES)

SECONDARY OPERATIONS INTERNAL TO CYCLE TIME - IDENTIFICATION MARK, WASH & RINSE & DRY, AND PACKAGE.
$45.00 PER HOUR SHOP RATE
12.000 MINUTES CYCLE TIME WITH ALLOWANCES FOR 1 MAN 1 MACHINE
5 PARTS PER HOUR
[21MP VIDEO]    PROCESS COST PER PART $9.00

CNC MACHINING PROCESSES:
MACHINING OPERATION 1 - 36'' BAR LENGTHS WITH BAR PULLER
CYCLE TIME  XXX.X SECONDS (X.XXX minutes)

                                                                ROUGH TURN
                                                                0.843 DIA DRILL
                                                                ROUGH BORE
                                                                FINISH BORE 16 Ra
                                                                FINISH TURN 32 Ra
                                                                THREAD O.D.
                                                                FINISH TURN 32 Ra
                                                                THREAD O.D.
                                                                GROOVE O.D.
                                                                CUTOFF
                                                                BAR PULLER

MACHINING OPERATION 2 - BORE SOFT JAWS HAND LOADED
CYCLE TIME XX SECONDS (X.XXX minutes)
[Process Simulation - 21MP Op-2]
                                                                ROUGH FACE
                                                                ROUGH  I.D. CHAMFER
                                                                FINISH FACE 32 Ra
                                                                FINISH  I.D. CHAMFER 32 Ra
                                                                TREPAN 32 Ra


MACHINING OPERATION 3 - MILL FLATS
CYCLE TIME XX SECONDS (X.XXX minutes)
                                                                MILL FLAT @ 90 DEGREES
                                                                BREAK EDGES @ 90 DEGREES
                                                                INDEX PART
                                                                MILL FLAT @ 270 DEGREES
                                                                BREAK EDGES @ 270 DEGREES


21MP01000 SIMULATION OF THE ACTUAL FANUC G-CODE PROGRAMS


SUMMARY 1 MAN 1 MACHINE ANALYSIS:
+$  9.86 RAW MATERIAL COST PER PART
- $  2.33 RECYCLED MATERIAL PER PART
+$  9.00 PROCESS COST PER PART
BASELINE PRICE PER PART $16.53
TARGET PRICE $?.??

OEMs, distributors and end users, call 716-652-4510 or email for further information.
Since 1993 implementing technology for businesses where internal talent is non-existent or during a growth initiative.

FAMILY-OF-PARTS PROCESSES ALSO AVAILABLE


©1996-2010: mfgaa.com®  All rights reserved. Subject to change without notice.
[ Home ]